Industrial rooftop solar

Solar that respects
the realities of your site.

Industrial solar begins with operational context. We look at energy patterns, facility constraints, safety and project delivery before shaping a technical and commercial plan.

For factories and facilities

Plan energy around
how work gets done.

Production shifts, shutdown windows, process loads and the electrical setup shape a useful solar design. The first step is understanding the site and the teams who operate it.

✓
Factory, warehouse and logistics roof assessments
✓
Load profile and daytime consumption review
✓
Electrical infrastructure and interconnection discussion
✓
Installation safety and operations coordination
Discuss an industrial site
Large commercial building exterior
A useful site assessment

Look beyond the roof area.

Rooftop capacity is one part of a larger project assessment. A robust proposal considers the building, the connection and the business model together.

Facility

Roof type, structural capacity, waterproofing, access, fall protection and ongoing maintenance routes.

Energy

Demand profile, operating hours, utility tariff, demand charges, current power quality and future loads.

Grid connection

Connection voltage, interconnection limits, metering, approvals and export rules at the site.

Project delivery

Working hours, permits, contractor induction, safety processes and planned shutdowns.

Commercial model

Compare project ownership, financing or energy-service options based on the terms available to your organization.

Ongoing operations

Monitoring, service access, cleaning, response expectations and handover responsibilities.

A coordinated project

From first review
to operational handover.

Every industrial project is site-specific. This overview describes the typical workstreams and can be tailored after a facility discussion.

01 · SCOPE

Align stakeholders

Bring energy, facilities, finance, procurement and EHS teams into the brief.

02 · SURVEY

Study the facility

Review the roof, electrical systems, access and operating constraints.

03 · DESIGN

Evaluate the plan

Check generation profile, connection requirements, scope and commercial assumptions.

04 · DELIVER

Build and commission

Coordinate site work, testing, documentation and system handover.

Prepare for a first discussion

Bring the information
you already have.

Electricity bills

At least 12 months of invoices and interval data if available.

Facility documents

Roof drawings, single-line diagrams and electrical details if available.

Operating context

Site hours, future expansion plans and any restricted work periods.

Request a project review